Yaobai daily output of 10,000 tons of clinker cement production line project is located in Huiyuan Industrial Park, Sunyuan Town, Yaozhou District, covering a total area of 828 acres, with an investment of 2 billion yuan. It adopts the second-generation new dry production process and supports the construction of 15WM pure low-temperature waste heat Power generation system and annual solid waste and hazardous waste disposal project with an annual capacity of 200,000 tons. The project highlights the concepts of green, intelligence and conservation, leads the building materials industry in ultra-low energy consumption and ultra-low emissions, and vigorously promotes the requirements of green and sustainable development. Our equipment is mainly used in raw material batching, clinker batching, and raw material measurement in the factory. About 30 sets of measuring equipment such as quantitative feeders, plate chain scales, and electronic belt scales are in use.